Kevin Edwards chose Building Interiors to design and deliver their brand-new building in Leeds. They are a fast paced, dynamic young company and wanted their office to reflect this. The brief was to accommodate quite a lot into a relatively small space;- co-working space, wellbeing area, conference and meeting spaces, bar, games area as well as the all-important workstations for up to 40 people. It was important to them that the building be a professional space which could also be used by staff to socialise and enjoy themselves.
수정됨_birds-flying-in-sky_t20_xJbyn1
Full refurbishment of reception, atrium and washrooms including; Strip-out, mechanical & electrical alterations, exposed ceilings, feature lighting, flooring, decoration, bespoke joinery items, furniture and signage.
Through various design team meetings and discussions around design, product specifications and project delivery Building Interiors were successful in meeting all demands that this project presented.
수정됨_do-alto_t20_Aono9r
Refurbishment of ground floor and first floor offices including changes to the reception area. An industrial theme was adopted in places which including stripping out a suspended ceiling and utilising natural products where possible.
수정됨_florida-palm-trees-on-a-sunny-day_t20_LQPX6z
The traditional outdated typical warehouse office consisted of bare block walls, limited light levels, and a very uninspiring space!
Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in close contact with the client every step of the way. As often happens throughout a scheme, changes were requested and implemented throughout the duration without impeding the programme.
Weekly process meetings were held in order to show the client how the scheme was progressing .
The project was successfully delivered on time and on budget by the Building Interiors internal team.
The client really wanted an industrial look but the space was very modern. We helped achieve this look through the use of a dark colour scheme, black brick and steel finishes.
수정됨_minimal_t20_yw0WgL
Our client tendered this project through CBRE and we were successful in developing the concept design to a full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.
Building Interiors complied with all idea boilers rigorous health and safety requirements. Through partnering with their on-site team we successfully completed all designs and installations as required.
Building Interiors completed a full strip out of the existing building and installed the agreed Design & Build scheme to the high standard that HH Global required.
수정됨_synchronicity-of-purpose_t20_XYe1yb
A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.